CSCSC Partners
Better
Camden
Middlesex+Swimming
London+Swimming
British+Swimming
Jack+Petchey+Foundation
Arena
Solo+Sports
EasyFundraising
ProSwimwear
Mallinson pool: update for Wednesday 9th March

The Mallinson Sports Centre Highgate remains closed today, Wednesday 9th March, following a burst water pipe last week. 

The following sessions are therefore cancelled:

6.10-7.10pm Hihgate lessons stages 1 to 7

7.15-8.15pm Highgate Development  Gold session cancelled.  Swimmers are warmly invited to attend training with Swiss Development 5.00-6.00pm in the main pool Swiss Cottage Leisure Centre

7.10-8.10pm             Jags session cancelled

8.15-9.15pm             Highgate Club Squad session cancelled

Please accept our apologies for the inconvenience caused.  We understand that the water pipe has now been repaired but that the pool temperature needs to rise to an acceptable level before the pool reopens.  This new item will be updated as soon as we receive a further update from the Mallinson